Eligible Improvements You Can Install

Energy efficiency and renewable energy improvements eligible for CEIP financing across all property types

Improvement Categories

DRC Qualified Contractors can install improvements across all 8 eligible categories. Each project is evaluated by DRC for eligibility, projected energy savings, and compliance with program requirements.

Building Envelope

Upgrades to doors, windows, insulation, and air sealing that improve the thermal performance and airtightness of the building shell.

  • Air curtains
  • Air infiltration, sealing, and pressurization
  • Energy-efficient windows
  • Insulation (wall, attic, foundation)
  • Building automation system upgrades

Mechanical Systems

High-efficiency heating, ventilation, air conditioning, and water heating equipment that reduces energy consumption.

  • High-efficiency boilers and furnaces
  • Heat pumps (air-source, ground-source)
  • Energy/heat recovery ventilators (ERV/HRV)
  • High-efficiency chillers and packaged cooling
  • High-efficiency water heaters
  • Smart thermostats
  • Pipe and duct insulation

Lighting

LED retrofits and lighting controls that reduce electricity consumption while maintaining or improving light quality.

  • LED lighting retrofits (interior and exterior)
  • Lighting controls and occupancy sensors
  • Daylighting systems

Solar and Renewable Energy

On-site renewable energy generation systems including solar photovoltaic arrays, solar thermal collectors, and other renewable technologies.

  • Solar photovoltaic (PV) panels
  • Transpired air collector systems
  • Solar thermal systems

Energy Management

Building automation and control systems that optimize energy use through monitoring, scheduling, and load management.

  • Building automation systems (BAS)
  • Demand control ventilation
  • Energy monitoring and load management

Motors and Drives

Variable frequency drives and high-efficiency motors that reduce electricity consumption in commercial and industrial applications.

  • Variable frequency drives (VFDs)
  • High-efficiency motors

Commercial Kitchen

Energy-efficient commercial kitchen ventilation and equipment upgrades that reduce energy consumption in food service operations.

  • Demand control kitchen ventilation (DCKV)

Contractor Responsibilities

Pre-Installation

  • Review the project scope and energy audit recommendations
  • Confirm equipment specifications meet DRC requirements
  • Obtain all required permits before commencing work
  • Coordinate with supervising engineer or architect

Post-Installation

  • Submit project completion report within 10 business days
  • Provide as-built documentation and commissioning records
  • Cooperate with post-project energy audit (1 year after completion)
  • Honour warranty obligations as specified in Project Agreement